CLIENTS PROJECTS

GIANNAKOS GROUP


The high sense of responsibility of our company, the consistent execution of works, as well as the building of confidence in our name have contributed to the constant increase of our clients over time.

CLIENTS

Indicatively, some of our clients are the following:


CLIENTS

Indicatively, some of the projects we have carried out are the following:


2017

CONTRACTOR: ENERCON GMPH
PROJECT: ERECTION OF 10 WIND TURBINES (Ε 44 ) AT THE WIND FARM OF KALOGEROVOUNI, LAKONIA

CONTRACTOR: ENERCON GMPH
PROJECT: ERECTION OF 9 WIND TURBINES (Ε 70 ) AT THE WIND FARM OF FANTAROS, RHODOPE, THEIR TRANSPORT TO THE WIND FARM FROM THE PORT OF ALEXANDROUPOLIS, AS WELL AS LOADING-UNLOADING WORKS AND INTERNAL TRANSPORT WITHIN THE PORT

CONTRACTOR: ENERCON GMPH
PROJECT: ERECTION OF 3 WIND TURBINES (Ε 48) AT THE WIND FARM OF VARIKO, METSOVO, THEIR TRANSPORT TO THE WIND FARM FROM THE PORT OF STYLIDA, AS WELL AS LOADING-UNLOADING WORKS AND INTERNAL TRANSPORT WITHIN THE PORT

CONTRACTOR: VESTAS
PROJECT: TRANSPORT OF 10 WIND TURBINES (V 90) TO THE WIND FARMS OF KOUKOS AND KAPSALA, AETOLOAKARNANIA, UNLOADING OF WIND TURBINES FROM THE SHIP, INTERNAL TRANSPORT AND LOADING-UNLOADING WORKS IN A STORAGE SITE WITHIN THE PORT OF STYLIDA

CONTRACTOR: ENEL
PROJECT: MAINTENANCE OF WIND TURBINES AT THE WIND FARMS OF GERAKI, SOROS, MONASTIRI, ALEXANDROUPOLIS

CONTRACTOR: TERNA ENERGY
PROJECT: MAINTENANCE OF WIND TURBINES AT THE WIND FARM OF LOUZES, NAFPAKTOS (REPLACEMENT OF GEARBOX)

2012

CONTRACTOR: TERNA S.A.
PROJECT: SERRES
ASSIGNED TASK: PLACEMENT OF PREFABRICATED BEAMS

CONTRACTOR: ARMOS S.A.
ASSIGNED TASK: TRANSPORT AND PLACEMENT OF PREFABRICATED BEAMS AND PREFABRICATED ROOMS THROUGHOUT GREECE

CONTRACTOR: ET.M.ER. S.A.
PROJECT: REFINERIES OF THESSALONIKI
ASSIGNED TASK: MAINTENANCE

2011

CONTRACTOR: EKME
PROJECT: REFINERIES OF THESSALONIKI
ASSIGNED TASK: MAINTENANCE

CONTRACTOR: ENERCON GMBH
PROJECT: ANEMOESSA IN SITEIA, CRETE
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

2010

CONTRACTOR: EKME
PROJECT: REFINERIES OF THESSALONIKI
ASSIGNED TASK: REPLACEMENT OF COOLING TOWER

CONTRACTOR: TERNA ENERGY
PROJECT: SKOPIA NAFPAKTOS
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

CONTRACTOR: ENERCON GMBH
PROJECT: AMFISSA, PHOCIS
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

CONTRACTOR: ENERCON GMBH
PROJECT: AMFISSA, PHOCIS
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

CONTRACTOR: VESTAS HELLAS SA
ASSIGNED TASK: MAINTENANCE OF WIND TURBINES THROUGHOUT GREECE

CONTRACTOR: GAMESA
ASSIGNED TASK: MAINTENANCE OF WIND TURBINES THROUGHOUT GREECE

2009

CONTRACTOR: ENERCON GMBH
PROJECT: AGHIA DYNATI, CEPHALONIA
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

CONTRACTOR: ENERCON GMBH
PROJECT: MAGOULA KAZAKOU, ALEXANDROUPOLIS
ASSIGNED TASK: UNLOADING FROM SHIP – TRANSPORT TO THE WIND FARM AND PLACEMENT

2008

CONTRACTOR: METKA S.A.
PROJECT: PPC S.A. / PLANT OF AGHIOS DIMITRIOS – UPGRADING OF THE EXISTING ELECTROSTATIC ASH FILTERS AND ADDITION OF NEW FILTERS AT THE PLANTS
ASSIGNED TASK: ERECTION OF EXHAUST GAS CONDUITS AND COMPONENTS OF ELECTROSTATIC FILTERS OF PLANT ΙΙΙ, WITH THE USE OF A 500TN TELESCOPIC CRANE
TIME PERIOD: FEBRUARY 2008

CONTRACTOR: V. ANASTASOPOULOS AND CO. GENERAL PARTNERSHIP
PROJECT: TECHNICAL WORKS AT THE PPC FACILITIES AT AGHIOS DIMITRIOS
ASSIGNED TASK: ERECTION OF ELECTROSTATIC ASH FILTERS AT THE NEW PLANTS OF PPC S.A./ THERMOELECTRIC POWER STATION OF AGHIOS DIMITRIOS
TIME PERIOD: AUGUST 2008

CONTRACTOR: METKA S.A.
PROJECT: PPC FACILITIES AT MEGALOPOLI
ASSIGNED TASK: DISMANTLING OF A POTAIN MD 600 TYPE BUILDING CRANE, OF A HEIGHT OF 142 METERS AND A WEIGHT OF 11 TONS WITH THE USE OF A 500-TON CRANE.
TIME PERIOD: SEPTEMBER 2008

CONTRACTOR: MELKA S.A.
PROJECT: VOLOS BYPASS ROAD, SECTION GORITSA – AGRIA.
ASSIGNED TASK: WORKS OF PLACEMENT, WITH THE USE OF CRANE VEHICLES OF 200 ΤΝ, 400 ΤΝ AND 500 ΤΝ, OF 32 PRESTRESSED BEAMS OF A WEIGHT OF 120 TONS AND A LENGTH OF 38 METERS EACH AT THE BRIDGE Τ15 OF THE ABOVE PROJECT AT A HEIGHT OF 35 METERS
TIME PERIOD: SEPTEMBER 2008

CONTRACTOR: TERNA ENERGY INDUSTRIAL AND TECHNICAL S.A.
PROJECT: CONSTRUCTION OF THE DAM OF GYRTONI ON RIVER PINEIOS, PREFECTURE OF LARISA
ASSIGNED TASK: LIFTING OF METAL MOLDS ON A DAILY BASIS AT THE ABOVE PROJECT WITH 30 ΤΝ AND 50 ΤΝ CRANES.
TIME PERIOD: DECEMBER 2008

CONTRACTOR: OSE (HELLENIC RAILWAYS) PROJECT
ASSIGNED TASK: LOADING FROM THE PORT OF STYLIDA, TRANSPORT OF RAILS OF A LENGTH OF 36 METERS AND UNLOADING AT THE STATION OF PALEOFARSALOS
TIME PERIOD: DECEMBER 2008

2007

CONTRACTOR: TERNA ENERGY INDUSTRIAL AND TECHNICAL S.A.
SUBCONTRACTOR: THIVAI LTD
PROJECT: WIND FARM OF MYTOULA-KEFALI AT THE PREFECTURE OF EVROS (SAPES)
ASSIGNED TASK: ERECTION OF 5 WIND TURBINES OF VESTAS V80 TYPE AT THE WIND FARM
TIME PERIOD: MARCH 2007

CONTRACTOR: ATTI-KAT TECHNICAL S.A.
PROJECT: EGNATIA ROAD
ASSIGNED TASK: PLACEMENT OF 90 BEAMS OF 100 ΤΝ EACH AT THE BRIDGES (SECTION PANAGIA – GREVENA) AT A HEIGHT OF 30 METERS
TIME PERIOD: APRIL 2007

CONTRACTOR: “AKTOR TECHNICAL S.A. – TERNA S.A. – VIOTER S.A. JOINT VENTURE”
PROJECT: DAM OF PRAMORITSA
ASSIGNED TASK: LIFTING OPERATIONS FOR THE PLACEMENT OF CAPS, RACKS, SLUICE GATES AND STEEL PIPES AT THE WATER SUPPLY SECTION OF THE DAM, THE PLANT AND THE DIVERSION TUNNEL.
TIME PERIOD: JUNE 2007

CONTRACTOR: AKTOR TECHNICAL S.A.
PROJECT: EGNATIA ROAD S.A. “SECTION PANAGIA – GREVENA”
ASSIGNED TASK: CONSTRUCTION WORKS AT BRIDGES C4 AND C3 OF THE ABOVE PROJECT
TIME PERIOD: JULY 2007

2006

CONTRACTOR: VERMION TECHNICAL S.A.
PROJECT AND ASSIGNED TASK: LOADING OF 45 ΤΝ CELLS WITH DIMENSIONS OF 3.70 METERS OF WIDTH AND 7.20 METERS OF LENGTH, FROM THE INDUSTRIAL PLANT OF VERMION TECHNICAL S.A. IN LARISA, TRANSPORT TO CHIOS (FOR WHICH 18 SEMI TRUCKS WERE USED) AND PLACEMENT OF THE CELLS WITH THE USE OF A CRANE AT THE SITES OF VERMION TECHNICAL S.A. ON CHIOS
TIME PERIOD: JULY 2006

2004
OLYMPIC GAMES PROJECTS

CONTRACTOR: PAPADAKIS
ASSIGNED TASK: PLACEMENT OF A METAL ROOF AT THE TAE KWON DO VENUE PROJECT, PLACEMENT OF STANDS OF AN OUTDOOR SWIMMING POOL, PLACEMENT OF STANDS AT THE HEAVYWEIGHTS VENUE PROJECT IN LIOSIA, PLACEMENT OF MOUNTINGS FOR LIGHTS AT THE PERIMETER OF OAKA STADIUM.

CONTRACTOR: INTRAMET
PROJECT: PANTHESSALIKO STADIUM OF VOLOS
ASSIGNED TASK: TRANSPORT FROM LARISA TO THE FACILITIES OF INTRAMET OF THE PANTHESSALIKO STADIUM IN VOLOS AND ERECTION OF A SHELTER AND METAL STRUCTURES OF DIMENSIONS OF 6.5 METERS OF WIDTH AND 25 METERS OF LENGTH
TIME PERIOD: MAY 2004

CONTRACTOR: EFKLIDIS S.A. – METON S.A. JOINT VENTURE
PROJECT: CONSTRUCTION OF THE ATHENS-THESSALONIKI-EVZONI MOTORWAY, SECTION PASSING THROUGH THE URBAN ZONE OF KATERINI
ASSIGNED TASK: DISMANTLING AND LOADING OF METAL BEAMS
TIME PERIOD: JUNE 2004

2003

CONTRACTOR: TERNA S.A.
PROJECT: CONSTRUCTION OF THE BEACH VOLLEY OLYMPIC VENUE AND WORKS OF INFRASTRUCTURE AND REGENERATION OF THE FALIRON BAY
ASSIGNED TASK: TRANSPORT AND PLACEMENT OF 250 BEAM SECTIONS OF THE BRIDGE, OF A LENGTH OF 45 METERS AND A WEIGHT OF 65 ΤΝ, OF THE INTERNAL COLLECTOR AND WESTERN FLOOD PROTECTION CHANNEL OF THE PROJECT
TIME PERIOD: APRIL 2003

CONTRACTOR: FRANTZI NEW BRIDGE JOINT VENTURE
PROJECT: TRANSPORT AND PLACEMENT OF BEAMS OF A LENGTH OF 36 METERS AND A WEIGHT OF 72 ΤΝ FROM TRIKALA TO LAMIA FOR THE PROJECT OF CONSTRUCTION OF A NEW BRIDGE ON SPERCHEIOS RIVER ON THE COUNTRY ROAD LAMIA – FRANTZI
ASSIGNED TASK: TRANSPORT AND PLACEMENT OF BEAMS AND PILLARS ON THE SUPPORTS FOR THE CONSTRUCTION OF THE BRIDGE
TIME PERIOD: NOVEMBER 2003