CONTRACTOR: METKA S.A.
PROJECT: PPC S.A. / PLANT OF AGHIOS DIMITRIOS – UPGRADING OF THE EXISTING ELECTROSTATIC ASH FILTERS AND ADDITION OF NEW FILTERS AT THE PLANTS
ASSIGNED TASK: ERECTION OF EXHAUST GAS CONDUITS AND COMPONENTS OF ELECTROSTATIC FILTERS OF PLANT ΙΙΙ, WITH THE USE OF A 500TN TELESCOPIC CRANE
TIME PERIOD: FEBRUARY 2008

CONTRACTOR: V. ANASTASOPOULOS AND CO. GENERAL PARTNERSHIP
PROJECT: TECHNICAL WORKS AT THE PPC FACILITIES AT AGHIOS DIMITRIOS
ASSIGNED TASK: ERECTION OF ELECTROSTATIC ASH FILTERS AT THE NEW PLANTS OF PPC S.A./ THERMOELECTRIC POWER STATION OF AGHIOS DIMITRIOS
TIME PERIOD: AUGUST 2008

CONTRACTOR: METKA S.A.
PROJECT: PPC FACILITIES AT MEGALOPOLI
ASSIGNED TASK: DISMANTLING OF A POTAIN MD 600 TYPE BUILDING CRANE, OF A HEIGHT OF 142 METERS AND A WEIGHT OF 11 TONS WITH THE USE OF A 500-TON CRANE.
TIME PERIOD: SEPTEMBER 2008

CONTRACTOR: MELKA S.A.
PROJECT: VOLOS BYPASS ROAD, SECTION GORITSA – AGRIA.
ASSIGNED TASK: WORKS OF PLACEMENT, WITH THE USE OF CRANE VEHICLES OF 200 ΤΝ, 400 ΤΝ AND 500 ΤΝ, OF 32 PRESTRESSED BEAMS OF A WEIGHT OF 120 TONS AND A LENGTH OF 38 METERS EACH AT THE BRIDGE Τ15 OF THE ABOVE PROJECT AT A HEIGHT OF 35 METERS
TIME PERIOD: SEPTEMBER 2008

CONTRACTOR: TERNA ENERGY INDUSTRIAL AND TECHNICAL S.A.
PROJECT: CONSTRUCTION OF THE DAM OF GYRTONI ON RIVER PINEIOS, PREFECTURE OF LARISA
ASSIGNED TASK: LIFTING OF METAL MOLDS ON A DAILY BASIS AT THE ABOVE PROJECT WITH 30 ΤΝ AND 50 ΤΝ CRANES.
TIME PERIOD: DECEMBER 2008

CONTRACTOR: OSE (HELLENIC RAILWAYS) PROJECT
ASSIGNED TASK: LOADING FROM THE PORT OF STYLIDA, TRANSPORT OF RAILS OF A LENGTH OF 36 METERS AND UNLOADING AT THE STATION OF PALEOFARSALOS
TIME PERIOD: DECEMBER 2008