CONTRACTOR: TERNA ENERGY INDUSTRIAL AND TECHNICAL S.A.
SUBCONTRACTOR: THIVAI LTD
PROJECT: WIND FARM OF MYTOULA-KEFALI AT THE PREFECTURE OF EVROS (SAPES)
ASSIGNED TASK: ERECTION OF 5 WIND TURBINES OF VESTAS V80 TYPE AT THE WIND FARM
TIME PERIOD: MARCH 2007
CONTRACTOR: ATTI-KAT TECHNICAL S.A.
PROJECT: EGNATIA ROAD
ASSIGNED TASK: PLACEMENT OF 90 BEAMS OF 100 ΤΝ EACH AT THE BRIDGES (SECTION PANAGIA – GREVENA) AT A HEIGHT OF 30 METERS
TIME PERIOD: APRIL 2007
CONTRACTOR: “AKTOR TECHNICAL S.A. – TERNA S.A. – VIOTER S.A. JOINT VENTURE”
PROJECT: DAM OF PRAMORITSA
ASSIGNED TASK: LIFTING OPERATIONS FOR THE PLACEMENT OF CAPS, RACKS, SLUICE GATES AND STEEL PIPES AT THE WATER SUPPLY SECTION OF THE DAM, THE PLANT AND THE DIVERSION TUNNEL.
TIME PERIOD: JUNE 2007
CONTRACTOR: AKTOR TECHNICAL S.A.
PROJECT: EGNATIA ROAD S.A. “SECTION PANAGIA – GREVENA”
ASSIGNED TASK: CONSTRUCTION WORKS AT BRIDGES C4 AND C3 OF THE ABOVE PROJECT
TIME PERIOD: JULY 2007